Plummer v Edward
| Jurisdiction | St Lucia |
| Court | High Court (Saint Lucia) |
| Judge | Shanks, J. |
| Judgment Date | 10 March 2005 |
| Neutral Citation | LC 2005 HC 17 |
| Docket Number | SLUHCV 1995/0031 |
| Date | 10 March 2005 |
Shanks, J. (Ag.)
SLUHCV 1995/0031
High Court
Tort - Trespass — Right of way — Claimant seeking continuation of injunction and damages in respect of road running along right of way on defendant's land — Road made impassible by defendant — Whether claimant having lawful right to use road — Whether claimant trespassing — Evidence considered — Defendant never agreeing to establishment or use of road — Claimant ordered to pay damages for trespass.
Mr. Dexter Theodore for defendant
Mr. Oswald Larcher for claimant
The defendant is the owner of 0.6 hectares of land at Moulin-a-Vent registered as parcel 1254B 329. The land is bounded to the south by the Monchy high road with a frontage of about 100m. He purchased it in 1970 and it remains undeveloped and wild. The second claimant is the owner of parcel 1254B 847 which lies to the east of the defendant and also has a frontage to the high road. To the north of the second claimant's land lie parcels 1254B 524, 525, and 526, which are owned by the fourth, third and first claimants respectively. The western boundary of each of those lots also forms part of the eastern boundary of the defendant's land.
Parcels 524, 525 and 526 are effectively “land-locked” and it is common ground that there is a 5 foot wide right of way which runs through the second claimant's land and parcels 524 and 525 giving access to parcel 526 along the defendant's eastern boundary. This case is about a “motorable” road which (roughly speaking) follows the right of way. The claimants say that the defendant agreed to this road being cut in 1991 and widened and repaired in 1994. The defendant denies that he ever agreed to a road along the existing alignment which he says passes through his land.
The case arises because in 1994 the defendant took steps to prevent the road being used by the first claimant. She obtained an injunction from Matthew J in December 1994 which had the effect of preventing the defendant interfering further with her use of the road. (Strictly speaking this was in separate proceedings ( case 947/1994) but in effect it was an interlocutory injunction in these proceedings, albeit it has been in force for the scandalously long period of over ten years).
The first claimant seeks the continuation of that injunction and claims damages in respect of damage which the defendant did to a bridge carrying the road across a small ravine running through his land and for delay she suffered in building works she was carrying out on her land in 1994 as a consequence of the access road being impassable. She also seeks a contribution she says the defendant agreed to make to survey costs in relation to the road in 1994. It is not entirely clear what claim the other claimants make though the second claimant told me in evidence that she was concerned about the position of her boundary with the defendant and I suppose the fourth and third claimants would have an interest in whether the existing road can continue to be used though I am not sure they are still owners. The defendant counterclaims for an injunction to stop the first claimant trespassing on his land by using the road and for damages.
Rufinus Baptiste was appointed by the court to report in relation to the boundary between the defendant's land and that of the claimants and he produced an extremely helpful report in June 2004. He concludes very dearly that the access road does not follow the exact alignment of the right of way. At the point where it meets the Monchy high road it lies entirely on the defendant's land; half the bridge lies on his land; and the road is not off his land until it reaches the first claimant's parcel. In all the road encroaches some 119 square metres onto the defendant's land. There was a faint suggestion from Mr. Larcher for the claimants that Mr. Baptiste's conclusions were wrong but I can see no basis for so concluding and in any event no attempt was made to ask Mr. Baptiste any questions or to call him to be cross-examined so that his conclusions could be challenged (see CPR 32.8(1), 32.7(1) and 32.10). In the circumstances I have no hesitation in accepting Mr. Baptiste's report in its entirety and in particular that the boundary between the defendant's and the claimants' land is shown by the blue One 1A-2-6A on his plan RB10 (as I understand his report this is the alignment shown on the Girard plan prepared in 1972).
Since the first claimant's claim arises out of interference by the defendant with the road which I have concluded ran over his own land and Mr. Larcher was not able to suggest any basis of liability unless I found for the claimants in relation to the alleged 1991 and 1994 agreements it must be right that the result of the case will depend entirely on my findings of fact about those agreements.
I heard evidence from the first and second claimants and Earl Cenac for the claimants and from the defendant and his friend Victor Girard. Before dealing with the facts in detail I note that although a witness statement was filed for the third claimant he did not appear to give evidence and that the first claimant's statement conspicuously failed to comply with CPR 29.5 (1) (f): not only was it patently not in her own words, it was in the third person and it followed very closely the wording of the Statement of Claim.
The first claimant's witness statement says that she and the second and third claimants orally agreed with the defendant in January 1991 to build a 10 foot wide motorable road over the right of way to her parcel 526 which would include 5 feet to be contributed by the defendant. The Third claimant then constructed the road and built a bridge over the ravine. In her evidence she stated that only she and the third claimant (and not the Second) were present when the agreement was made and she suggested for the first time that there was already in existence a dirt road which the parties were agreeing to extend up to her parcel. She accepted that the third claimant was away and that nothing happened in relation to his building works or the road from 1991 to 1994.
The defendant's evidence was that the road in question was cut by the third claimant in the second half of 1990 without any notice to him and at a time when he was not even aware that the third claimant was a neighbour of his. When the defendant confronted the third claimant about the road he had cut across his (the defendants) and the third claimant told him that he was about to build a house on his land and that he had been under the impression that there was some land in the area provided for a road.
The defendant says that he then reported the matter to the Survey Department who...
Get this document and AI-powered insights with a free trial of vLex and Vincent AI
Get Started for FreeUnlock full access with a free 7-day trial
Transform your legal research with vLex
-
Complete access to the largest collection of common law case law on one platform
-
Generate AI case summaries that instantly highlight key legal issues
-
Advanced search capabilities with precise filtering and sorting options
-
Comprehensive legal content with documents across 100+ jurisdictions
-
Trusted by 2 million professionals including top global firms
-
Access AI-Powered Research with Vincent AI: Natural language queries with verified citations
Unlock full access with a free 7-day trial
Transform your legal research with vLex
-
Complete access to the largest collection of common law case law on one platform
-
Generate AI case summaries that instantly highlight key legal issues
-
Advanced search capabilities with precise filtering and sorting options
-
Comprehensive legal content with documents across 100+ jurisdictions
-
Trusted by 2 million professionals including top global firms
-
Access AI-Powered Research with Vincent AI: Natural language queries with verified citations
Unlock full access with a free 7-day trial
Transform your legal research with vLex
-
Complete access to the largest collection of common law case law on one platform
-
Generate AI case summaries that instantly highlight key legal issues
-
Advanced search capabilities with precise filtering and sorting options
-
Comprehensive legal content with documents across 100+ jurisdictions
-
Trusted by 2 million professionals including top global firms
-
Access AI-Powered Research with Vincent AI: Natural language queries with verified citations
Unlock full access with a free 7-day trial
Transform your legal research with vLex
-
Complete access to the largest collection of common law case law on one platform
-
Generate AI case summaries that instantly highlight key legal issues
-
Advanced search capabilities with precise filtering and sorting options
-
Comprehensive legal content with documents across 100+ jurisdictions
-
Trusted by 2 million professionals including top global firms
-
Access AI-Powered Research with Vincent AI: Natural language queries with verified citations
Unlock full access with a free 7-day trial
Transform your legal research with vLex
-
Complete access to the largest collection of common law case law on one platform
-
Generate AI case summaries that instantly highlight key legal issues
-
Advanced search capabilities with precise filtering and sorting options
-
Comprehensive legal content with documents across 100+ jurisdictions
-
Trusted by 2 million professionals including top global firms
-
Access AI-Powered Research with Vincent AI: Natural language queries with verified citations